1 Conducting Detailed investigations, Design and estimation, Excavation for Main Canal, formation of banking and CC Lining of Polavarakm Irrigation Project Left Main Canal from Km. 0.00 to 25.60  (Package-LMC-1)  254.88 91.80 63.98% 31-Dec-19
2 Package No.17/2006:- Construction of Somasila Swarnamukhi Link Canal from Km.39.900 up to tail end (100.06Km tentatively) duly connecting to Manna samudram tank through Merlapaka tank near Erpedu village including construction of CM & CD works together with raising standards of Devulapalli tank to 1.00TMC capacity and improvements to Pagur tank for stabilization of 84225 Acres of ayacut including Investigation, Designs and Estimation in Nellore and Chittoor Districts. Package No.17/2006 253.37 39.32 84.48% 31-Oct-19
3 Rapti Main canal , DS ,CM&CD Works ( KM 80.00 to 114.00 K ) LOT-6  in district Balarampur, Siddhanthnagar , UP 360.89 87.10 75.87% 31-Dec-19